Request Extension for Completion of Contract for Installation of Water System at Farm

Date
May 15, 1906

J. R. Wise requests an extension to complete the contract with George Bridges for the installation of engine, tank, tower, and other materials for the water system at the school farm.

Time Period
Year
Standard Forms & Transactions
Repository
National Archives and Records Administration
Location
RG 75, Entry 91, box 3137, 1906-#42839
Request Extension for Completion of Contract for Installation of Water System at Farm