Date:
May 15, 1906
J. R. Wise requests an extension to complete the contract with George Bridges for the installation of engine, tank, tower, and other materials for the water system at the school farm.
Read Documents:
Time Period:
Year:
People:
Format:
Repository:
National Archives and Records Administration
Location:
RG 75, Entry 91, box 3137, 1906-#42839