Date
              May 15, 1906
          J. R. Wise requests an extension to complete the contract with George Bridges for the installation of engine, tank, tower, and other materials for the water system at the school farm.
Read Documents
          
      Time Period
          
      Year
          
      People
          
      Format
          
      Standard Forms & Transactions
          
      Repository
              National Archives and Records Administration
          Location
              RG 75, Entry 91, box 3137, 1906-#42839
          
